Hi Experts,
I realy need some help here!
I have to do a full data load from a DSO to an InfoCube with almost 400 million registers.
First I tried to split the data load by 0CALDAY, but even 6 months it´s too much data, but BW has to deal with this data volume!
I delete the InfoCube Indexes, because of deadlocks I´m using 20 paralel process with 500 registers per package.
But I noticed something, on SM50, the jobs used by the DTP doesn´t refresh, it´s like if they are reserved for the DTP. So I have jobs with 17000s ongoing.
The data load becomes slower as longer as it goes.
Anyone has any idea??
There is a way to make the system refresh the background jobs instead of use the same for all the data load?
Oh, and doesn´t have any ABAP code on transformations.
Thanks!
Regards.