I would like to change existing PM operation or add new one in ERP and then load it into BW via delta to 0PM_C04 cube. Now, when I add operation I don't see any updates in LBWQ. No error, just nothing in the queue. Looks like the 2LIS_17_I3OPER extractor can't see that I changed or added a PM operation, and as it is designed to fetch PM operation data, it should.
↧