Hello Friends,
I have a BWA setup with 10 Operational / master blades with 7 backup blades. In order to improve overall capacity / performance of BWA I would like to move 2 blades from backup to master so that I will have 12 master blades and 5 backup blades.
could you pls provide me the best practices or how to document for the same?