Re: Process chain failed.
Hi Ganesh That depends on what kind of data flow you have. For 7.x ----> Run the DTP For 3.x ---> In DataSource---> Manage you get a option of Updating with Scheduler . Before doing this,...
View ArticleRe: Process chain failed.
Dear Anindya,Thanks for reply. As per your reply"Before doing this, change overall status of Request to green.. ( in your screenshot last two requests are in Red status )" when I try to change the...
View ArticleRe: Process chain failed.
Hi Ganesh This is coming because of Repeat Delta Mechanism SAP has for InfoPackage. Let's say your delta request did not come properly from source system and request failed . Then you can make it red...
View ArticleRe: Process chain failed.
Hi Ganesh, If its a 7.0 flow, after correction of the data at PSA level, run delta DTP as for usual load. If its a 3.5 data flow, then update the manually corrected PSA using the symbol Anindya told,...
View ArticleRe: Process chain failed.
Dear Anindya,when I try to run the scheduler without making request green, Data target shows empty. ThanksGanesh
View ArticleRe: Process chain failed.
What is you data flow? 7.x or 3.x ? Do you have transformation or Transfer Rule ? Please note, if it is 7.x request need to be set to green before running DTP.
View ArticleRe: Process chain failed.
Hi In that case, try to goto details tab of monitor of request you have corrected manually.Find the data package where the error was and try to update it manually. Best Regards,Arpit
View ArticleRe: Process chain failed.
Did you check if the last red request was deleted from Data Targets? If you are 3.x ( emulated) DataSource, you should be able to see Objects under Data Target tab Can you give us a screen shot of your...
View ArticleRe: Transferring Business Content Data Sources into Active Version
Hi Alan O'Hanrahan, Apart from the ones that Arpit told, please check this link aswell. http://scn.sap.com/thread/621734 BRPrabhith
View ArticleNeed to delete Inactive Transformations in Prod Sys
HI Experts, We have two transformations in PRD Sys between same source(DS) & target (DSO). Reason: While transporting transformations first time we miss the sequence, so that the transformation in...
View ArticleRe: Filter settings in UPSPL T-Code SAP BW BPS
Hi Rajat,The settings can be edited in T-code BPS0.Goto BPS0-> Select planning folder and then Planning level -> In the selection Tab we can maintain the filter.Hope this helps.
View ArticleRe: Need to delete Inactive Transformations in Prod Sys
If the system is opened delete the transformation and take that in a request, then unlock the request and remove the objects from the request. or the below link may help...
View ArticleDelta for 0CO_OM_WBS_6 and 0CO_OM_WBS_7 not working
Hello Team, 0CO_OM_WBS_6 and 0CO_OM_WBS_7 is not picking changed records, kindly let me know what could be the issue. The full load works fine but wen I intialize and delta queue is alwayz zero. Thanks...
View ArticleRe: Need to delete Inactive Transformations in Prod Sys
HI Suman, Thanks for quick reply. I have already read the document and tried also. But its not working. Below is the screen shot Regards,M K
View ArticleRe: NW 7.3 specific - Semantically DSO partitioning
Hi Istvan, I have been working with SPO for several years now. I can only give you positive feedback, especially if you operate it in a standardized way. Some tips and tricks:Standardize your...
View ArticleRe: How to determine first data package in a load
use this DATA: lv_datapakid type rsdatapid. lv_datapakid = datapackid.
View ArticleRe: Need to delete Inactive Transformations in Prod Sys
have you tried the first option, what happened.
View ArticleRe: Need to delete Inactive Transformations in Prod Sys
Hi, if you have access to prod to delete them. you can do it.if not then at dev system delete your transformations and collect that deletion into transport.if you won't get transportation option, ask...